2005 to 2011
|
Renovation
Gainesville, GA
|
|
Full Renovation of 18 hole, 6,756 yard, Par 72 course originally built in 1959 by Robert Trent Jones Sr. The program included renovating all greens, tees and bunkers with slight hole shifts in an effort to create room and to improve upon playability. Construction plans were completed October 2005. Construction began in January 2006 and completed in October 2006.
|
| |
Renovation Master Plan
Winchester, KY
|
|
Retained by the Club to develop a Master Plan for Course Improvements. The Master Plan was completed in the Fall of 2005. Installation of fairway irrigation and re-grassing of fairways was completed in the Summer of 2006.
|
| |
Development of Tree Plan
Louisville, KY
|
|
Developed a Tree Plan for the golf course as a follow-up to the renovation work completed in November 2004 as Keith Foster's Design Associate. Plan was completed March 2006.
|
| |
Construction of Par 3 Hole
Richmond, KY
|
|
Retained by the University to develop a Par 3 hole adjacent to new building constructed for the Turf and Golf Management Department. Hole is used by the students and faculty for both research and leisure activities. Shaping of hole completed in March 2006 with the students installing the irrigation, drainage and doing all prep work and grassing. This was done as a 3 week credit level course which provided the students with hands-on experience. |
| |
Renovation
Baldwin, MO
|
|
As Keith Foster's Design Associate: Preliminary site visits with development of Construction Plans, Specifications, Cost Analysis, Construction Review and Punchlist for the renovation of Driving Range, new Short Game Area, new Putting Green with adjustments to Holes 15 and 18.
|
| |
Construction Work
(Formerly Mahan Manor Golf & Hunt Club)
Winchester, KY
|
|
New 9 Hole layout developed for a private owner. Routing developed during the fall of 2006. Course is a Par 36 at a length of 3,371 yards. Construction began March 2007 and was completed in October 2007 (Project was shut down for 6 weeks prior to grassing because of water restrictions set forth by the county due to an extremely dry summer.) (Opened for select play during the summer of 2008 - Began taking semi-private memberships and allowed public play in fall of 2009 after "Bombs Away" Grand Opening with PGA Tour Pros, John Daly and J. B. Holmes.)
|
| |
Plan Options
Murray, KY
|
|
Developed Options for Hole shifts that would provide the Club the ability to sell off sections of its property for residential development to generate funds for future improvements to the golf course.
|
| |
Development of Tree Plan
Louisville, KY
|
|
Developed a Tree Plan for the golf course as a follow-up to the renovation work completed in November 2004 as Keith FosterŐs Design Associate. Plan was completed October 2009. |
| |
Development of Tree Plan
Louisville, KY
|
|
On-site consultation for installation of concrete cart path as a follow-up to the renovation work completed in November 2004 as Keith FosterŐs Design Associate. |
| |
Routing Options for 2nd 9 Holes
Winchester, KY
|
|
Developed Routing Options for the possibility of adding an additional 9 Holes. |
| |
Improvement Options for 18th Hole
Greenville, MS
|
|
Developed Options for improvements to the existing 18th Hole with Preliminary Cost Estimates. |
| |
17th and 18th Hole Renovation
Richmond, KY
|
|
Develop Conceptual Options for improvements to the 17th and 18th Holes with Preliminary Cost Estimates. |
| |
New 9 Hole Course
Hazel Green, KY
|
|
Developed Routing for new 9 Hole layout with Preliminary Cost Estimate . |
| |
15th Green and #16 Back Tee Renovation
Lexington, KY
|
| Construction Documents completed with Bid Analysis. |
| |
Master Plan Development
Goshen, KY
|
| Retained by the club to develop a Long Range Master Plan for Course Improvements with Preliminary Cost Estimate. |
| |
Construction Documents & Specs
Lexington, KY
|
| Developed Construction Documents, Specifications and Bid Analysis for Course Renovation. (Renovated the 18th Green in the Fall) |
| |
Fairway Re-grassing
Goshen, KY
|
| Developed Construction Documents & Bid Analysis for the Re-grassing of the existing Ryegrass Fairways to Meyer Zoysia. Select Tee & Bunker Work and expansion of the 2nd Green were completed as well. (Program began in late June and was completed the first week of August).
Developed Driving Range Plan for future renovation work.
|
| |
Improvement Options for 1st Hole
Goshen, KY
|
| Developed Conceptual Options for relocation of the 1st Green & construction of a new pond. |
| |